Technical Details:

The Dominion Boulevard Project consisted of a new 95-foot-high, fixed-span, four-lane bridge which replaced the two-lane moveable steel bridge. The roadway was widened from two lanes to four lanes from Grassfield Pkwy. to I-64. Interchanges were constructed at Cedar Rd., Bainbridge Blvd./Dominion Lakes and Great Bridge Blvd. A fully automated system was implemented to collect tolls using E-ZPass or toll-by-plate.  Construction began in January of 2013 and tolling began in February of 2017.  The project was completed ahead of schedule.

Scope of work included but was not limited to:

  • Over 400,000 LF of Conductor
  • Approximately 14,000 SF of Sign Panel
  • Approximately 20 Overhead Sign Structures and Toll Gantries
  • DMS
  • Over 500 CY of Concrete Foundations
  • Approximately 350 Luminaires, Associated Light Poles, and Electrical Services
  • 7 Traffic Signal Intersections

Benefits/Positive Aspects to Community:

  • Enhanced safety due to less congestion, fewer stops and better access
  • No bridge openings
  • No stop lights between Grassfield Pkwy. and the Interstate
  • Four lanes of traffic with interchanges
  • Improved hurricane evacuation route
  • Faster public safety response times